Manhattan · New York, NY
Kitchen Remodeling on the Upper East Side
Upper East Side clients tend to want a kitchen that reads calm and permanent: stone that runs uninterrupted, cabinetry with real inset doors, appliances fully integrated. That is the standard of work we build to, block by block from Museum Mile to Yorkville.

What Upper East Side kitchens need
White-glove prewar co-ops on Park and Fifth, townhouses in the 60s and 70s, and high-rise condos along Second and Third.
Integrated appliance walls
Sub-Zero, Wolf and Miele columns set flush into custom paneling with the tolerances actually held.
Marble handled properly
Slab selection with you at the yard, book-matched seams, honed and sealed edges detailed in advance.
White-glove building protocol
Service elevator scheduling, staff coordination and insurance limits that satisfy the strictest managing agents.
Recent projects in Upper East Side
The Park Ave Open
Calacatta counters and floor-to-ceiling glass in a 12-room prewar co-op with an integrated butler's pantry.
East 74th townhouse
Ground-floor kitchen rebuilt with a 10-foot island, twin dishwashers and a dedicated wine wall.
Serving ZIP codes 10021, 10028, 10065, 10075, 10128.
Upper East Side kitchen remodeling FAQs
Do you work with designers and architects?
Often. We build from your designer's drawings or handle design in-house — whichever the project calls for.
How far in advance should I book?
Custom cabinetry runs 10 to 14 weeks from approval, so most Upper East Side projects start 3 to 4 months after the consult.
Is there a warranty?
Every kitchen carries a 2-year workmanship warranty on top of the manufacturer warranties for appliances and stone.
Free estimate